    GREENHEART RIG CONVERSION PROPOSAL

    Present Conditions

     
    In the aftermath of the Tohoku tsunami of 3/11/11, much (up to 90% in some areas ) of the fishing fleet of small and mid-sized boats has been lost, damaged, and washed inland.   The commercial waterfront has been congested with debris, and machinery destroyed or damaged.  The wharf side support infrastructure of warehouses, refrigeration facilities and transportation links for the fishing industry has been disabled.  There is an urgent need to repair vessels, replace infrastructure and restore docks, waterways and seafood farming beds to operable conditions.
     
    One aspect of the Greenheart (Gh) 32 meter design is the innovative A-frame rig that serves both as a crane and as a mast for sails.  This Gh rig allows stable, heavy-lift capability over the bow of the vessel,  folds down flat to permit vessels passage under low bridges, and stows along the rails and bows of a vessel to permit use of the entire deck, hatches and machinery at all times.  Installation of the Gh rig will not require major modifications or  structural alterations of a small vessel.
     
    Proposal
     
    Greenheart proposes the use of its rig technology for the conversion of a 12-meter fishing boat from the affected area.  A Gh rig would be re-engineered for, and fitted on the trial vessel for the specific tasks of clean-up, removals, and installations in the tsunami recovery zone.   Greenheart would provide technical support and supervision for the construction, testing and whatever modifications might be necessary for the prototype rig.  Greenheart would also provide follow-up support during operations, and re-engineering for subsequent trials on other vessels.
     
    We believe that the temporary conversion of idled fishing boats into small workboats will provide employment for the crippled fishing industry in the region, and speed the recovery of the affected marine zones by allowing many local boat owners to participate in the  clean-up and rebuilding efforts.
     
    Gh rigs could remain installed on the local fleet to give it increased capabilities and provide emergency sail propulsion and fuel savings in the future.  
     
     
    We have done some of the preliminary re-engineering for a scaled-down rig:
     
     
    Bow-load concept
    touhoku001.jpg
     
    Stern-load sample plans
    GAREKIcleanerGA(jpeg).jpg
     
    ( Click images to enlarge )
     
     
     
     

    被災地における改良型船舶事業のご提案

     

    現状

    3月11日の東日本大震災によって、多くの漁船などの船舶が甚大な被害をうけました。また被災地の港は津波で流されたがれきに埋もれ、機械類も大きな損傷を受けています。埠頭や漁業をささえる倉庫、冷凍・冷蔵施設、道路などのインフラもその機能を失いました。被災地の漁業の復興のためには、これらのインフラの再構築や港や船舶の修繕が急務です。

     

    NPO法人グリーンハートでは、主に発展途上国向けに新しいタイプの小規模貨物船のデザインを手がけてきました。私たちの船舶の大きな特徴のひとつは、革新的なAフレームマストです。これはマスト本来の機能のほかに、クレーンとしての役割も果たします。このグリーンハートリグは、船首方向から重量の大きな荷物を安定的に持ち上げることを可能にします。また、折りたたみ式マストのため、低い橋げたの下を航行することが可能です。それは(マスト)レールに沿って格納することもでき、その他の作業(漁業の操業など)の使用に際しても問題ありません。グリーンハートリグを設置することは、通常の船舶を大きく改造したり構造的な変更を行う必要もありません。

     

     

    ご提案

     

    グリーンハートでは、今回震災の被害を受けたエリアの12メートル級漁船にこのリグの設置を行いたいと考えています。まずはグリーンハートリグを試験的に船に取り付け、港湾の掃除、がれきなどの除去、港湾設備の設置などを行いたいと思います。グリーンハートは技術的サポートからリグの改良、設置までのすべてを管理します。またグリーンハートは、実際の漁船などでの運用にあたり、必要なフォローアップやリグの改良なども行います。

     

     

    私たちは、使用していない小さな漁船を一時的に変更することは、被災地の漁業に就労機会を提供することが可能です。そして漁船所有者が現地の復興作業に参加することで、復興のスピードを上げられることと思います。

     

    グリーンハートリグは、復興事業が終わった後も、現地の船舶に引き続き設置し、帆の推進力を使用することによる燃料の削減をすることも可能です。

     

     
     
     
    Was this page helpful?
    Tags: (Edit tags)
    • No tags
    FileSizeDateAttached by 
    A Gh rig
    No description
    13.29 kB18:46, 18 May 2011patutleyActions
     GAREKIcleanerGA(jpeg).jpg
    No description
    174.14 kB14:32, 27 May 2011AdminActions
    グリーンハートリグ
    Fishing boat rig - plans
    13.29 kB22:22, 19 May 2011patutleyActions
    Comments (0)
    You must login to post a comment.